People hold gates
- Nothing becomes a ticket until a person types APPROVE.
- Architecture is approved before any code is written.
- Every live write waits for approval.
Incident Ops, Infrastructure Ops and AI-DLC on one governed platform, for enterprises in India and the GCC.
Product walkthrough, 8 min 13 s. Screens show the demo tenant.
Principles
Pilot
Each pair is scaled to its own before value.
52 detected over 12 weeks. Remaining 10 derived as 52 minus 42.
Use cases
Seven steps per case. The replay stops at each gate until APPROVE is typed.
Sample incident
ROI
Built on the demo-tenant pilot timings. Adjust the inputs to your estate.
Cost sliders start as placeholders. Licence and run costs are not netted off. This is a planning estimate based on demo-tenant timings: 0.81 is the remediation rate (42 of 52), 222 and 12 are restore minutes before and after, 118 and 2.1 are written RCA minutes before and after. The free proof of concept replaces these figures with numbers measured on your own infrastructure.
Systems
One catalogue for help desk, source control, telemetry and knowledge. Named here:
Contact